After testing the new skirts on land, in preparation for taking the vehicle out for testing on the water I worked with Victor to add some drain holes at the back to allow any water in the bag to be released.
We sketched out an area, cut some slits and then covered it with a flap of rubber with a rear facing opening to avoid snats.
The holes cut with markings for positioning the covering flaps.
The covering flap with vinyl cement applied.
The port pair of drain holes covered up
The starboard drain holes covered
The center drain holes covered.
The center drain holes needed some extra wax paper as the first application of vinyl cement had the cover with the glued side facing the wrong way, so it would scoop water instead of drain water. 8-)
The corners aren't pretty but they hold air and I think they'll scuff the ground and likely wear down. But if I keep an eye on them, I suspect that they'll wear nicely to show where they need to be trimmed back and a few sequences of patches the skirt will evolve to be a more natural shape.
Front left corner
Backleft
Back right
Front right
Here's what it looks like. (Warning: lots of noise.)
With some extra hands from Jenny I was able to get the remaining 3 corners glued shut. It's not super pretty, but I think it will hold air. And I'll plan to adjust it after inflation tests. I think it may even be worth trying to glue it while under pressure for then it will at least be holding shape, and with letting the glue get tacky before hand it sticks pretty well in one shot.
With some help from Michael today I made good progress on the rest of the skirts.
We started cutting out out sections for the front and rear of the vehicle. They're slightly deeper so go across the half way point so we couldn't put them side by side.
Practice skirt over new material for front and back.
Attaching the skirts makes it look a lot more like a real hovercraft.
Outer edges of skirts attached
We moved on to attaching the inner edge of the skirt in the front.
Inside of first skirt attached.
Punching the holes on the underside is a pain. So we switched the order and lined up and punched the holes first on top, before moving to the underside.
All the holes punched and validated
While working on it the screws would pop off easily as we were working on it so I switched to using zip ties for guidance.
Using zip ties for guidance.
Cable ties down the port side skirt.
The small spacing between the batton straps and the rub rails made the prepunching even more important since visibility is limited. And being under-hung it's hard to hold everything in place simultaneously.
There's also important aspects to how to overlap the skirt parts. By switching the overlap we were able to make it so it will slide better over the ground without getting hooked.
After with lip facing backwards
Before with lip facing forward
We trimmed some of the corners off to make the joint more rounded, but it's definitely going to be pretty ugly at the corners. But hopefully it will float high enough so that it will not matter too much. I know it's not going to deal with plow in well anyway. We glued it in a moderately curved manner. The heavier skirt material is harder to bend and secure in the billowed shape.
Here's the first results. It looks like it will hold the air. We'll have to see how it looks once it's inflated.
First corner glued
Later in the afternoon I had a little bit more time so I attached the aft and port skirt inside edges. And now it's starting to take shape. Just some more gluing to do.
Looking underneath with the skirts mostly attached.
Today with the great help from Victor I've started recreating the hovercraft skirts using the vinyl material that came with the skirt replacing the cheap plastic practice ones.
There was a little bit of sanding left over but the bottom of the craft looks good. And it's good to see the craft back flat in the garage.
Back horizontal, but on blocks for work
Laying out the old skirts on top of the new material we've cut oversided elements. After attaching them we'll cut them down. The skirt material cuts in half nicely to form the size of the skirt for each side.
Side skirt laid on top of the new uncut materaial
The new skirt material compared to the test skirt templates.
The attachment battons worked out well. Though we had to find a way to make holes in the right places. But it turns out there's a good tool in inventory for that, a hole punch ;-)
The very specialized tooling.
And even better the standoff distance needed from the edge was approximately the same as the depth of the hole punch so you just had to line up the lateral alignment.
The first side took alittle while to put on, and we put the batten on the wrong side up at first. But the 2nd one went quickly. And we stretched it out the full length first, then slide it up to punch the holds and put in the intermediate holes for the batten screws.
First side attached.
And we briefly tested the vinyl cement that looks like it will be fine to just cement the joints without stitching. And it nicely sets in a few minutes so gluing the corners shouldn't be too much of a challenge.
Here's the final view with skirt material dangling from both sides.
Thanks to my helper Jenny today! We successfully inflated the test skirts using
We had to tape together 2 corners. Batten down the perimeter and then make a few tweaks to the starboard hull. (Note it's upside down and pointing into the garage so the starboard side is away from the camera.)
Inflated skirts
Here's the timelapse:
The skirts inflated and could take some weight resting on them with just the shop vac!
Lessons Learned
There were quite a few lessons learned today.
The port side skirt ended up 2" too short, so the front had to wrap around.
Missed front port corner.
The front batten port most screw got started cross threaded, and I tried to force it. Unfortunately the weakest point in the system is the wood the tee-nut is threaded into and I ended up with the tee-nut spinning behind the batten. It took some forceful work with vicegrips to get the screw out. And now the threads in the tee-nut are shot, so I think I'll be grinding that section of the batten out and gluing in a replacement segment with a new tee-nut, since the corner is the most critical portion of the batten.
Cross-threaded
Adjusting the starboard side required a little scrunching:
Scrunched skirt under batten from shifting starboard skirt by 2 inches
Also the rear starboard corner does not quite line up correctly. When transferring the template we need to make sure to take this into account.
Corner length miss alignment. The port side was folder over to match.
Next steps:
Landing pads, to protect the skirt when landing.
Lift engine mount. I think I'll test it out of wood for quick fabrication and testing. Then move onto waterjet cut alumninum. I think the wood will be strong enough for initial testing.
A big thanks to my parents who were in town and gave me a hand this weekend.
We made a bunch of progress on the skirts this weekend. Here's the timelapse:
A few details from the process. We are prototyping the skirts using drop cloth plastic picked up at the hardware store since it's cheap and readily available.
Thinking about how to secure the corners we ran into some zippers for tarps which we thought might be useful.
They did end up being useful, however we didn't use the zipper functionality. They turned into good adhesive tape. In the future I think I will do some research to find some good tape to use for joining the skirt elements. Certainly this tape is as strong as the skirt material. And it has a special zipper like anti abrasive rub surface ;-)
We experimentally determined the curves necessary for the joints using masking tape, the plastic and a shop-vac set to blow.
Prototyping with masking tape
The shape of this curve is quite complicated, and we learned the important part is that they line up, as well as the two pieces have the same linear length along the joint.
Two corners secured using zipper reinforced tape.
I also had not worked on the intake for the skirt at the front. So we added a crossmember under the lift fan to be able to catch the air and route it into the skirt.
Adding scoop area for filling the skirt from the lift fan.
We're not sure about the ratio of lift to skirt, but expect that we can adjust it with a baffle if we need more.
With the glue drying we had to stop work on the front skirt section. But once that dries the front skirt segment should be ready to go too.
Once I've verified the plastic skirt works as I like. i plan to cut it apart and measure it to make my templates for the rubberized vinyl version.
With more help from Christian I've been making great progress. We successfully create all the remaining skirt strips matching pieces.
We made much faster progress by using a small template piece, pictured below. This allowed us to not worry about the lateral alignment and simply make sure it lined up along the length of the strip. All the matching strips are paired to match a particular strip on the hovercraft to match their specific idosyncracities. (aks hand drilling inaccuracies.)
An example of the template for marking the mating strips.
Here's the time-lapse of this stage.
You'll see at the end we also started cutting the stock for the superstructure.
Christian and I made the first two matching strips for the skirt attachments.
This involved cutting them to length, followed by carefully marking out and drilling the clearance holes. We first drilled with 3/16th, but due to imprecisions using hand tools we found 1/4" holes were much more likely to line up.
Here's the time-lapse of our work.
Then end result looks pretty good. I'll need to get some more approximately 5/8" screws.
The 5/8" screws next to the attached skirt.
The corner with both matching skirt strips in place.
Today I was able to attach the skirt strips for the bottom of the vehicle. Thanks a lot to Christian for the help today!
We attached the strips to what will be the bottom of the boat where the inside edge of the skirt will attach.
Here's the timelapse view of our work.
The strips as prepared before. We applied epoxy to the strip and then used a staple gun to staple the strips to the hull. The staples will provide shear stiffness and help hold the strips down while gluing.
There were a few areas where we had issues keeping the strips down due to wavyness of the plywood. When stapling I tried to hold it down as well as possible but the staples weren't strong enough when there was a valley between two peaks of the waves. I added some of the buckets afterwards to try to help weigh down the problem areas.
The next step will be to do the sides. It's going to be a little tougher as it will be not on a horizontal surface. But the sides are much flatter so we won't need to worry about weighing it down or gaps forming.
Having started on the skirt strips there were a bunch more to do. There's actually quite a bit of perimeter of the skirt. There needs to be both strips lining the outside along the side of the hull, as well as on the underside holding the skirt to the bottom of the hull.
My fabrication technique was relatively quick and the hole are probably +- 1/2" so the outside strips will likely need some slightly larger holes with washers.
After the previous test run I was able to put together the rest of the strips I needed for the inside.
The next step will be to attach them all to the hull.
I've started working on a way to easily attach the skirts, with the ability to detach/reattach as well. My plan is to embed t-nuts in a strip of wood which is attached to the hull. On the outside a second strip can be screwed through to clamp the edge of skirt.
A t-nut from the back side
the t-nut from the front
For better seating I needed to counter drill the back so the strip will lie flat
The first skirt attachment strips
The t-nuts are 8-32 and are embedded in the back of 1.25x3/8" Everything is stainless steel for better longevity in and around water.
Unfortunately the GoPro does not do well when left powered down.. I tried to use it, even with the battery back pack. However it would not even turn on. After a few hours of charging there was no change. However a few days later i checked on it and it was fully charged and ready to go. I'll have to work on keeping it plugged in, or at least charging it the day before I want to use it.